Page 2 of 2

Re: Overwriting Loaded Job

Posted: Sat Jan 20, 2024 5:20 pm
by cncsnw
cnckeith wrote:try v5.08 i remember we were experimenting with having cnc12 "let go" of the file that is currently loaded so other programs could overwrite it, but i can't remember off the top of my head how we left it, i'll look back in the svn and see if i can find some notes in this regard on monday.
This is why I continue to ask for a single Release Notes file with the CNC12 release notes for all versions. Otherwise, trying to find when or if a problem that was reported back in v4.14 was fixed, becomes a very tedious process.

Re: Overwriting Loaded Job

Posted: Tue Jan 23, 2024 8:17 pm
by cnckeith
i just tested on v5.08 and i can overwrite a g code job with an editor while it is loaded in CNC12

Re: Overwriting Loaded Job

Posted: Tue Jan 23, 2024 8:41 pm
by cnckeith
release notes from v3.16 (October 2016) to current v5.08 attached.
cnc12_v5.08-v3.16_release_notes.pdf
(2.27 MiB) Downloaded 24 times